PRE FIX
Date: Sept. 14th, 2007 – Friday
Time: 9:00pm
Meetup Location: Adyar Bus Depot
Prefix will involve
a. Organization of materials
A group us will organize the raw materials and tools. They will be ready in a tempo that will be float around for materials where the I-fixers meet.
b. Divide the gathered into groups
Each group should involve people who can work on 14th night and the following morning. It would be great if the new comers get a chance to get their hands dirty on 14th night!
c. MOST IMPORTANT- In case our Rain God decide to pay us a visit tonight! We will have a good cup of coffee and meet tomorrow at the same place to carry our mission.
TO FIX
14th 10.00pm – 2.00 pm
We will carry our work at the respective roads from 10.00pm onwards till 2.00am
Within this 4 hrs our target for this campaign to fix a moderate 25 pot holes.
Procedure to FIX
Undoubtedly to fix pot holes using Asphalt (tar) is the best solution, but it needs experts to do that job and to do it our selves is a cumbersome and expensive process. We are talking to consultants and experts who are working on their way so that we, I fixers, at some point could use them for their DIY (Do-it-yourself) initiative.
Alternatively to use concrete (cement and aggregate mix) is our current solution for its definitely cheaper and a manageable task to fill pot holes. Following is a list of instructions termed as 4P’s for you to make sure you get everything right when you’re on the road fixing pot holes.
P1- Preparation of Concrete (Cement Aggregate Mix)
P2 - Preparation of pot hole
P3- Pouring the concrete
1. Sprinkle dry cement powder in areas where ever required.(this is done because once you pour the concrete the water will start settling to the bottom and the sprinkled concrete will absorb it)
2. Pour the concrete mix that is ready.
3. Ram it well and Use your trowel to make sure the aggregate and sand mix is is spread all over.
4. sprinkle some more cement on top so that it increases the setting of cement
P4- Precautions for making sure the cement concrete sets well
It would be ideal to divide your group into 4 so that each one can take care of a P
POST FIX
15th 10.00pm – 2.00 pm
This is as important as the work we did on the previous night. Our aim is not to keep fixing things forever (though we love it!) but to ensure there is a meaningful and sustainable out come for our actions. So we hope to carry our work to the next day morning.